Friday, May 22, 2015

Fw: Vacancy Consultant @ Conservation International : Palm Oil Plantation

On Thursday, May 21, 2015 11:57 AM, CI Indonesia <ci.indonesia@yahoo.com> wrote:


               Consultant ( Peat ) of Palm Oil Plantation for District South Tapanuli  and  District  Madina
 
There are some specific challenges in regard  to the  relation of  Palm Oil development in Indonesia, and one concern is the planting of oil palm on peat land.  There are wide potential impacts that can result from oil palm plantation on peat land, where these impacts are often specific to the peat land environment or the broader landscape ecosystem.
 
CI is seeking an experienced low emissions palm oil plantation consultant to support our work in North Sumatra. This Consultancy is a part of the SLP broader approach, particularly through the impact of reducing greenhouse gas emissions which is caused by palm plantation on peat land.
 
The consultant will be required to:
 
·         Provide a series of general recommendations of peat land condition and management of palm oil plantation in a given district in North Sumatra
·         Provide specific (see below) recommendations of peat land plantation management in one / two  of the private sector companies in the district of Mandailing Natal
·          To provide input on the current existing plantation company SOP in relation to plantation peat land management, including but not limited to:
a.       Advisory services on plantation management and local conditions relating both to good agricultural practice on peat land and how to lower emissions across a plantation level.
b.      LCC and land cover crop assessment and input.
c.       Input on the peat equipment being used within the plantation.
d.      Measurement and recommendations/ input on the 60-80cm water table measurement within a plantation and how to manage this most effectively.
e.      Specific input and recommendations of plantation peat land management from the perspective of:
-          Emissions reduction
-          Yield improvement
-          Drainage
-           Fertilizer usage
-           Watershed management and water movement throughout the plantation
 
Interested Consultants: Are to provide a 2 page overview of their planned approach to this consultancy a 1 page costing overview including their consulting rate, a 1 page overview of staff involved and their relevant experience (S1 in Agronomy minimum), and a paragraph that states their willingness to abide by a confidentiality clause as part of this consultancy for a period of 5 years. 
Interest consultants should send their interest in the above to bharaty@conservation.org requesting a complete TOR, and apply by email by May 30, 2013.
Any questions relating to the above should also be sent to bharaty@conservation.org, on the understanding that this question and answer will be shared across all consultants applying

No comments:

Post a Comment